Get Involved > Work Groups
Thank you for being interested in getting involved by physical work! Please look through the projects we have, below!
Meeting Room Roof
Project
Meeting room roof
The front side of the roof needs to be worked on.
-Take the old roof material off
-Insulate the roof.
-Put a plastic sheet on the rafters.
-New roof put on.
The front side of the roof needs to be worked on.
-Take the old roof material off
-Insulate the roof.
-Put a plastic sheet on the rafters.
-New roof put on.
Material Need
350m2 roofing material
Onduline: 1.500 Ft/m2
Rukki: 2.500 Ft/m2
Lindab: trapez: 1954 Ft/m2
Lindab: trapez: 683.900 Ft*
Wood (bramak lec) 60.000 Ft
Plastic sheet 31.500 Ft
Insulation 150.000 Ft
0.039 w/m2
Cost for unexpected items10%: 50.000 Ft
Onduline: 1.500 Ft/m2
Rukki: 2.500 Ft/m2
Lindab: trapez: 1954 Ft/m2
Lindab: trapez: 683.900 Ft*
Wood (bramak lec) 60.000 Ft
Plastic sheet 31.500 Ft
Insulation 150.000 Ft
0.039 w/m2
Cost for unexpected items10%: 50.000 Ft
Total: 1.071.400 Ft
$5.357
The other side of the meeting room 450m2
Lindab: 879.300 Ft
Plastic sheet 40.000 Ft
Total: 919.300 Ft
$4600
$5.357
The other side of the meeting room 450m2
Lindab: 879.300 Ft
Plastic sheet 40.000 Ft
Total: 919.300 Ft
$4600
Work Plan
DAY 1
Taking the old roof off.
Insulation
DAY 2
Fixing wood slats and then the plastic sheeting.
DAY 3-5
Putting on the new roof
Taking the old roof off.
Insulation
DAY 2
Fixing wood slats and then the plastic sheeting.
DAY 3-5
Putting on the new roof
DAY 1
Taking the old roof off.
DAY 2
Plastic sheet.
DAY 3-5
Putting on the new roof
Taking the old roof off.
DAY 2
Plastic sheet.
DAY 3-5
Putting on the new roof
Meeting Room Painting
Material Need
Outside: 355m2
120 Ft/m2
42.600 Ft
Cost for unexpected items 10%: 5.000 Ft
Total: 47.600 Ft
$238
One coat of paint!!!
Inside:
2000m2 40 Ft/m2
80.000 Ft
Cost for unexpected items10%: 8.000 Ft Hera paint
One coat of paint!!!
Toatal: 88.000 Ft
$440
Grand total: 135.600 Ft
$678
120 Ft/m2
42.600 Ft
Cost for unexpected items 10%: 5.000 Ft
Total: 47.600 Ft
$238
One coat of paint!!!
Inside:
2000m2 40 Ft/m2
80.000 Ft
Cost for unexpected items10%: 8.000 Ft Hera paint
One coat of paint!!!
Toatal: 88.000 Ft
$440
Grand total: 135.600 Ft
$678
Castle's Hallway - Downstairs
Project
-Walls and ceiling need cracks fixed etc.
-Then painted.
-New floor needs to be laid. Holes in floor need to be filled with concrete or another material. About 150m2 tiles to be laid.
- Tile baseboard needs to be installed.
-Then painted.
-New floor needs to be laid. Holes in floor need to be filled with concrete or another material. About 150m2 tiles to be laid.
- Tile baseboard needs to be installed.
Material Need
180m2 Tiles
@ 2.500 Ft/m2=
450.000 Ft
Glue: 70.000 Ft
Hera paint: 500m2
7 bucket @ 5.000 Ft/bucket =45.000 Ft
Spackle for cracks.
2*25kg bags=6000 Ft
Cost for unexpected items: 10% 57100 Ft
Total: 628.100 Ft
$3140
@ 2.500 Ft/m2=
450.000 Ft
Glue: 70.000 Ft
Hera paint: 500m2
7 bucket @ 5.000 Ft/bucket =45.000 Ft
Spackle for cracks.
2*25kg bags=6000 Ft
Cost for unexpected items: 10% 57100 Ft
Total: 628.100 Ft
$3140
Castle's Hallway - Upstairs
Project
The walls need some repair and then a special fibreglass wall paper has to be put on the wall. A special paint and glue mixture needs to be rolled on.
After this process, the walls need to be painted with one or two coats of paint.
After this process, the walls need to be painted with one or two coats of paint.
Material Need
Fibreglass wall paper + glue paint in one + colour paint.
Cost for unexpected items: 10% 100.000 Ft
Total: 1.100.000 Ft
$5500
Cost for unexpected items: 10% 100.000 Ft
Total: 1.100.000 Ft
$5500
Work Plan
DAY 1-2
Scraping the walls and repairing the holes and some sanding.
DAY 3-5
Wallpapering
DAY 6
Painting
Scraping the walls and repairing the holes and some sanding.
DAY 3-5
Wallpapering
DAY 6
Painting
Workshop Painting
Project
Paint workshop:
355m2
First walls need to be spackled and repaired, then painted.
If there is time, paint some of the inside rooms in the workshop.
355m2
First walls need to be spackled and repaired, then painted.
If there is time, paint some of the inside rooms in the workshop.
Material Need
355m2 exterior paint 120 Ft/m2
42.600 Ft
Spackle: 10.000 Ft Cost for unexpected items 10%:
5.260 Ft
Total: 57.860 Ft
$2893
One coat of paint!!!
42.600 Ft
Spackle: 10.000 Ft Cost for unexpected items 10%:
5.260 Ft
Total: 57.860 Ft
$2893
One coat of paint!!!
Floor Replacement
Project
There are 6 dorm rooms where the flooring needs to be replaced and the rooms painted with one coat of paint.
The old floor is either laminate or PVC floor.
The old floor needs to be removed and new to be laid instead.
The old floor is either laminate or PVC floor.
The old floor needs to be removed and new to be laid instead.
Material Need
Each room is about 70m2
Industrial PVC: 140.000 Ft
Glue: 20.000 Ft
Paqint:10.000 Ft
Cost for unexpected items10%: 17.000 Ft
Total: 177.000 Ft/room
$850
Industrial PVC: 140.000 Ft
Glue: 20.000 Ft
Paqint:10.000 Ft
Cost for unexpected items10%: 17.000 Ft
Total: 177.000 Ft/room
$850
The 6 rooms total cost is:
1.062.000 Ft
$5310
1.062.000 Ft
$5310
Work Plan
DAY 1
Scraping and fixing cracks and holes on walls.
DAY 2
Sanding, painting tearing up the old floors.
DAY 3
Start laying the new floors.
DAY 4-5
The same.
Scraping and fixing cracks and holes on walls.
DAY 2
Sanding, painting tearing up the old floors.
DAY 3
Start laying the new floors.
DAY 4-5
The same.
Complete Renovation of Showers
Project
Showers rooms of 6 dorms need to be redone completely:
-Old shower walls needs to be replaced.
-New wall
-New plumbing
-New tiles needs on floor and walls
-New paint
-Old shower walls needs to be replaced.
-New wall
-New plumbing
-New tiles needs on floor and walls
-New paint
Material Need
Per room!
150 bricks 10cm
long
57.750 Ft
Plumbing: 50.000 Ft
Tiles+glue: 35.000 Ft
Shower base: 15.000 Ft/piece: 6 piece: 60.000 Ft/bathroom
Cost for unexpected items10%: 21.000 Ft
Total: 221.000 Ft
$1105/room
6 rooms/$6630
150 bricks 10cm
long
57.750 Ft
Plumbing: 50.000 Ft
Tiles+glue: 35.000 Ft
Shower base: 15.000 Ft/piece: 6 piece: 60.000 Ft/bathroom
Cost for unexpected items10%: 21.000 Ft
Total: 221.000 Ft
$1105/room
6 rooms/$6630
Work Plan
DAY1, 2
-Demolishing
-Making new wall
DAY3
-Plumbing
-Shower testing
DAY4-5
-Tiling
Shower panels go back.
Per room!
-Demolishing
-Making new wall
DAY3
-Plumbing
-Shower testing
DAY4-5
-Tiling
Shower panels go back.
Per room!
Heating Pipe Insulation
Project
Heating pipe insulation between the dorms, meeting room and work shop.
Around 250 m of pipe needs to be insulated.
Old pipes need to be dug out, concrete covers need to be lifted off and then we insulate the pipes with a 4 inch Styrofoam. Concrete cover goes back and the soil replaced.
Around 250 m of pipe needs to be insulated.
Old pipes need to be dug out, concrete covers need to be lifted off and then we insulate the pipes with a 4 inch Styrofoam. Concrete cover goes back and the soil replaced.
Material Need
10 cm Styrofoam
600 Ft/m2
1300m2 @ 600Ft
=1.690.000 Ft
Backhoe renting
10.000 Ft/h
160.000 Ft
Cost for unexpected items 10%: 91.000 Ft
Total: 1.941.000 Ft
$10.000
600 Ft/m2
1300m2 @ 600Ft
=1.690.000 Ft
Backhoe renting
10.000 Ft/h
160.000 Ft
Cost for unexpected items 10%: 91.000 Ft
Total: 1.941.000 Ft
$10.000